Portfolio: Qualifications Statement
You count on Spaccamonti Excavating LLC's professional staff when you need residential or commercial utilities done for your home or business. This includes sewer, septic tanks, and water main needs. At Spaccamonti, LLC, we offer competitive prices for our licensed, bonded, and insured services. So give us a call today with your utilities needs.
Sand Creek Drop Structures:
It consisted of 13 drop structures, approximately 15,000 tons of soil riprap and associated earthwork
Colorado Springs-Fountain Creek Drop Structure along Sand Creek/Bear Creek:
The drop structure was located on Fountain Creek. The area in which to work was very restricted due to the location
Beckett Development Soil Riprap and Boulder Wall Project:
Located on Fountain Creek near Exit 132 off of I-25. The boulder wall consisted of a double wall constructed from 48" boulders approximately 2,600 lf in length , Approximately 5,600 cubic yards of soil.Riprap was placed on the adjacent slope to protect the future development, in addition a large amount of earth work needed to completed before the riprap could be placed.
Olney Springs Main Replacement:
Throughout City. This installation of 5 miles of well and spring collection lines, rehabilitation of several natural springs, new water lines throughout the city including service line and water meter replacements, directional boring, asphalt and concrete repairs.
Comanche 18'-24' Extreme Depth Project:
construction and installation of storm water lift station, 12"-36" storm drainage lines in a power plant. Included by-pass pumping, numerous concrete pours, 12"-36" butterfly valve installation, structural steel fabrication and welding.
Conservation Services:
Project consisted of re-rip rap and rebuild entire bank for the National Resources Conservation Services in Fountain, CO.
Interlocken Parkway in Broomfield Colorado:
new infrastructure containing 4000 ft of 36” DIP, various fire hydrants 12” to 60” RCP, storm line and manholes, 16000 ft of reuse waterline. Curb and gutter prep and back fill.
More Projects
BCT-H Complex at Ft Carson Colorado:
Project consists of 8,600 lf of RCP storm pipe, approximately 65 structures and 12,000 lf of water and sewer pipe. This job was very complex due to the amount of utilities to be installed, and the cooperation required when working around numerous subcontractors.
Ft. Carson Division Headquarters, Command & Control Facility:
Project consists of storm sewer piping of approximately 4200 lf of sizes ranging from 12” to 42” HDPE. A total of 48 storm water structures, i.e., inlets, manholes. Water and sewer pipe totals of approximately 3200 lf and approximately 120,000 cu.yd. of earthwork.
Town of Ordway:
Project consisted of the installation of 4 miles 8” waterline and associated work to include pressure reducing, pressure restraining valves, pump stations, river and canal crossings, reseeding of approximately 23 acres of grass land.
Six Range Project at Ft Carson:
Project consisted of earthwork, construction of targets, tank trails, service roads, and electrical trenching.
City of Pueblo:
Installation of sanitary sewer system installation and repair ranging form 4” to 8” schedule 40 sewer pipe at various locations around Pueblo
Emergency Contact
If an emergency arises, please contact us at (719) 544-8943.